We secure site control — from screening through to signed, registered and assignable option and lease agreements — and we run the zoning and grid connection procedures. We do not acquire land, we do not build, and we do not operate assets.
A development services agreement with milestone-based fees. Milestones are defined in the contract and paid on delivery: registered lease, final zoning decision, signed grid connection agreement, final building permit. We do not use the label “ready-to-build” as a payment trigger, because it has no statutory definition in Poland and lenders do not accept it without a signed connection agreement.
Distance to the substation and realistic available capacity come first — for storage, in both directions, because a battery is a consumer while charging. Hectares and soil class come second. Our grid map shows where the substations are.
We will not tell you a site is viable because a line runs across it. The presence of a substation does not mean there is capacity in it.
Sourcing land for solar farms, wind farms, and energy storage, with grid connection analysis and proximity to substations (GPZ). More →
Acquisition and consolidation of land for housing estates, warehouses, and office parks, optimising the usable floor area ratio (PUM). More →
Developing wasteland and post-mining sites, co-creating energy clusters and energy cooperatives. More →

We secure land for large-scale installations, understanding the distinct specifics of each technology, from expansive PV farms to compact but demanding BESS facilities.
Finding a plot is only the beginning. We bring the site to a build-ready state, guiding the investor through the most complex procedures.
Interpretation of the Local Zoning Plan (MPZP), or, where none exists, analysis of the Study of Conditions and Directions of Spatial Development (SUiKZP) for building-permit conditions. We optimise the profitable building intensity (usable floor area ratio, PUM).
Inheritance proceedings, removal of mortgage encumbrances, opening of new land and mortgage registers. We guarantee "clean land" status.
We establish transmission easements (water/sewer, gas, power) and rights of way, a prerequisite for a building permit.
Western management standards: structured land-acquisition reporting and transparent acquisition cost analysis.

Local governments hold substantial land assets, including degraded and post-mining sites, ideally suited for renewable energy projects. We help turn them into a source of income and energy security.