Solar panels on green land
Arena Energy — Landowners

Your land can work for you for 30 years.

Leasing land for solar, wind, or energy storage means a steady, index-linked income: at no cost, no risk, and with full notarial security.

01 — The questions that matter most

What you really want to know

02 — Selection

Does your land meet the criteria?

Below are the general parameters of an optimal plot for renewable energy projects. You don't need to meet every one. Simply submit your plot and we'll verify it in the GIS databases.

CriterionOptimal parameters
Soil classPreferably class IV, V, VI, along with agricultural wasteland and post-industrial sites, land with low agricultural value.
AreaFrom 1–2 ha (hybrid installations), through 5–10 ha, up to 20–25 ha and more. Minimum plot width: approx. 40–60 m.
Power gridUp to approx. 500 m to a medium-voltage (SN) line; for large sites, a distance of up to 3 km from a substation (GPZ) or high-voltage line is acceptable.
TopographyFlat land or with a gentle south-facing slope. Wetlands, forested areas, and heavily shaded terrain are excluded.
EnvironmentOutside Natura 2000 areas, national parks, and landscape parks. Ideally without a Local Zoning Plan (MPZP), or with one that permits renewable energy use.

Not sure? Our engineers will check the soil class, grid access, and planning restrictions themselves, based on the plot number and cadastral district. Just submit your plot →

03 — Profitability

Lease income calculator

Move the sliders to estimate your potential income. This is an indicative simulation. We will prepare an exact offer after verifying the plot.

From 1 to 100 ha
Market range: 7,000–20,000 zł/ha per year

Full rates typically kick in once construction begins. During the development period, you can continue farming the land and receiving subsidies.

Estimated annual income
150 000 zł
for a 10 ha plot at a rate of 15 000 zł/ha
Lease term29 years
Indexation~3% / year
Estimated total contract value6 700 000 zł

The simulation assumes an average indexation of 3% per year over 29 years. Actual terms depend on location, land class, and the contract.

04 — Process

From submission to contract, step by step

05 — Your security

Concrete mechanisms, not promises

  • Notarial deed with an enforcement clause (Art. 777 of the Polish Code of Civil Procedure) — rent payments legally secured.
  • Bank step-in rights over the lessee — under a project-finance model, the bank guarantees continuity of payments.
  • Annual indexation — rent rises in line with the inflation index (GUS/HICP).
  • Zero upfront costs — expert assessments and legal services are covered by the investor.
More on legal security
Solar farm under a dramatic sky
06 — Submission

Submit your land for free verification

All you need is basic information. A scouting engineer will contact you within 48–72 h.

  • Completely free and non-binding
  • Data protected in accordance with GDPR; we never resell it to anyone
  • You can attach a photo of the map instead of typing in the numbers
Thank you! Your submission has been received. We will contact you within 48–72 h.
Please enter your full name.
Please enter your phone number.
Please enter a valid email address.
Please enter the area.
Please enter the municipality.